Customization: | Available |
---|---|
Connector Type: | CCS1 CCS2 Chademo GB/T |
Start Mode: | RFID Card |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product parameter
|
|
|
|
|||
Communication Interface
|
RS485/CAN etc.
|
storage temperature
|
-40-+60
|
|||
Input voltage (AC)
|
AC380V
|
Operating temperature
|
-20-+55
|
|||
power
|
7W/14KW
|
Altitude
|
≤2000m
|
|||
Rated current
|
32A
|
Undervoltage protection
|
≤176VAC
|
|||
Display screen
|
4.3 inch touch screen
|
Overvoltage protection
|
≥264VAC
|
|||
Charging cable length
|
5m
|
Overload protection
|
≥35.2A
|
|||
Protection level
|
IP54
|
Background module
|
Ethernet/4G module
|
|||
Billing method
|
RFID swipe card/scan QR code/APP payment (optional)
|
|
|
What is your terms of payment?
|
A:online fast payment, T/T
|
Do you test all your chargers before shipping?
|
A: All major components are tested before assembly and each charger is fully tested before shipped
|
Can I order some samples? How long?
|
A: Yes, and usually 7-10 days to production and 7-10 days to express.
|
How long to fully charge a car?
|
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
|
Are you Trading Company or manufacturer?
|
A: We are professional EV charger manufacturer.
|